Applying the permissive overreaching transfer Trip of SEL 311L distance relay to protect the transmission line

Abstract

Vietnam\'s electricity system has been increasingly invested in development, meeting the growth rate of energy consumption demand in all socio-economic aspects. In particular, the energization and commission of solar and wind power plants greatly affect the stability and safety of the Vietnam power system. To improve the system\'s stability when incidents occur, one of the current solutions is to coordinate relay calibration settings which have a rapid reaction time at all voltage levels. To meet the above requirements, an option is to use Intelligent Electronic Device (IED) with fast processing speed, reduced latency, and multiple functions with intelligent algorithms. In addition, the solution to coordinate the protection areas between IEDs is being concerned. This paper presents the coordination of Permissive Over-Reaching Transfer Trip (POTT) interlock function of SEL 311L relay for power transmission lines to reduce the fault clearing time compared to the traditional calculation method.