KOMPOSISI PENGGUNAAN TENAGA KERJA ORGANIK DAN TENAGA KERJA SUBCONTRACTOR TERHADAP WAKTU DAN BIAYA PEMBANGUNAN KONSTRUKSI BADAN KAPAL PERINTIS 2000 GT
Abstract
Increased productivity in a shipbuilding is needed by a shipbuilding company. This is indispensable as it sees the growing demand for a new ship building with quality and time efficient. One way to improve the production process is to add a good amount of human resources. But keep in mind in the use of human resources is not necessarily for the use in every work because it also to avoid the accumulation of labor that led to other workers do not perform its activities. The composition of the use of human resources for organic labor and subcontractor is needed. In this paper, research on the composition of the use of organic labor and subcontractor to the time more quickly and cheaper cost. The method used is the calculation of JO using microsoft excel software so that it can be calculated correctly. One of the objectives of this study was to find out the large number of labor usage in the medium dockyard for the construction of 2000 GT pioneering vessels that include organic labor and subcontractors. In the composition of calculations performed on assembly workshop only because the workshop fabrication and erection workforce settings have been met and precise. The composition of the composition for the assembly workshop is 10% of the use of organic labor and 90% of subcontractor labor usage. From the calculation of the composition, obtained an average time savings of 20% of the shipyard realization. And the composition of cost savings of 11.4%.